ORKON INTERNATIONAL ENGINEERING TRAINING CONSULTANCY INC.

Office Address

Bükreş Street No:7/1-5 06680 Çankaya ANKARA / TÜRKİYE

Phone Number

+90 (312) 4665116 Pbx

Email Address

info@orkon.info

Turning Vision into Action

Every successful project begins with a solid foundation of insight, analysis, and planning.
At ORKON International, we transform ideas into actionable, investment-ready projects through comprehensive feasibility studies that combine technical excellence, financial precision, and environmental responsibility.

Our multidisciplinary team of engineers, economists, and project analysts delivers end-to-end feasibility assessments  helping clients make informed decisions, minimize risks, and optimize resources before a single foundation is laid.
Each study is tailored to align with international standards and investor expectations, ensuring both technical viability and long-term sustainability.

  • Field surveys

    Field surveys and stakeholder consultations

  • Risk evaluation

    Scenario-based analysis for risk evaluation

Methodology & Approach

ORKON’s approach to feasibility reporting is data-driven, transparent, and solution-oriented.
We employ modern analytical tools  including GIS mapping, hydraulic and structural simulations, and financial modeling software  to deliver reports that are both precise and practical.

Comprehensive Capabilities

Feasibility Report Preparation for the Municipalities of SASKİ (SAMSUN), Bergama (IZMIR), Ödemiş (IZMIR), MUĞLA (Central District), and KÜTAHYA (Central District)

Location: Samsun, Izmir, Muğla, Kütahya

This is a feasibility study prepared for the municipalities in Group A to implement water, wastewater, and solid waste management services through a World Bank loan provided to the Iller Bank.

PROJECT OWNER
Iller Bank General Directorate

PROJECT FINANCING ORGANIZATION
World Bank

PROJECT DESCRIPTION
This project covers the construction of a new drinking water system, improvement of the existing drinking water supply and distribution system, installation of a SCADA system, construction of a sewer system, drinking water and wastewater treatment facilities, and solid waste disposal for the aforementioned five municipalities. Existing infrastructure facilities (water, wastewater, solid waste, etc.) for these municipalities were examined, and problems related to these facilities and operations were identified. Detailed reports were prepared on solutions to these problems, establishing and strengthening institutional structures, and operational concepts. The report also recommended infrastructure strategies to ensure sustainable development for each municipality.

Other Notable Projects

UŞAK Province Feasibility Report Preparation

Şereflikoçhisar (ANKARA) Feasibility Report Preparation

Sustainability & Impact

Beyond technical soundness, every ORKON feasibility report emphasizes sustainability, efficiency, and social benefit.
Our studies have supported projects that:

Reduced infrastructure costs by up to 25% through optimized design

Cut environmental impact by 40% via sustainable materials and energy systems

Accelerated international funding approval through compliant documentation

Copyright © 2025 Orkon| All Right Reserved

Design by H.Dedeoglu